JUNGLEORAMA JUNGLEORAMA

Extra Tall Dog Gate with Door, Pressure Fit, Auto Close, Double Locking for Doorways Hallways Stairs, 29"-34", White

See Buyer Reviews
$92.75 $103.05 Sale −10%

Today's Deal Ends In —

✓ In Stock

🚚 Tracked Shipping · Est. Delivery 5–12 business days Ships from our network of warehouses with tracking. Delivery times vary by destination.

🏷️ Buy More, Save More · Buy 3+ save 5% · Buy 6+ save 10% — applied automatically at checkout

house-pets
SKU
JR-M878BLHQ
Category
dogs

Jungle Intel

About This Item

Specs, features, and everything worth knowing before you buy.

Extra Tall Dog Gate with Door

This safety gate is designed to keep pets away from specific areas while providing easy access through a middle door for quick passage. It is ideal for doorways, hallways, and stairways.

Key features

  • Automatically closes when left open between 30° and 90° angle
  • Features a double locking system for extra security
  • Door can be set to open both directions or locked to a side
  • Lead free metal frame provides solid and strong construction
  • Adjustable width allows fitting in different doorways and frames
  • Slide-and-lift handle makes it easy to use

Specifications

ColourWhite
MaterialMetal, Plastic
Overall Dimensions (without extension)29.1"W x 34.3"W x 37"H (74-87 x 94 cm)
Door Size26.8"W x 37"H (68 x 94 cm)
Bar Spacing2" (5 cm)

What's in the box

  • 1 x Pet Gate
  • 1 x Manual

Good to know

  • Use expansion screws in the stairway and so on.

Secure your home with this safety gate today!

Verified Buyers

Customer Reviews

Only customers who purchased Extra Tall Dog Gate with Door, Pressure Fit, Auto Close, Double Locking for Doorways Hallways Stairs, 29"-34", White — and have received it — can leave a review.

— Loading…

Loading reviews…